Where possible gravel required for construction of the wind farm site will be sourced from within the wind farm boundary. Sources may include excavated material from turbine footings and other wind farm infrastructure excavations, existing quarries, or new quarries. Where insufficient gravel is available on site it will be imported from an external source.